Cartier Cuts 7.5 g/t Au Over 2.0 m and Extends 2B Zone to 350 m Depth on the Chimo Mine Property

Cartier Resources Inc. (TSX VENTURE:ECR) (“Cartier”) is pleased to announce new results from its ongoing 30 000-m drilling program on the Chimo Mine property, located 45 km east of Val-d’Or. These results are associated with the 2B Zone (2 structure) and the 4E Zone (4 structure) intersected respectively at 230 m and 110 m east-northeast of the shaft.