Skyharbour Partner Company Azincourt VTEM Survey Completed and Adds to East Preston Prospectivity

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has preliminary results from the recent helicopter-borne Versatile Time-Domain Electromagnetic (VTEM™ Max) and Magnetic survey conducted over the southeastern portion of the East Preston Uranium Project, located in the western Athabasca Basin, Saskatchewan. read more

NexGen Intersects Continuous and Strong High-Grade Mineralization in all of the Initial A2 Sub-Zone Targets from Feasibility Stage Drilling

T.NXE, NexGen, uranium
Figure 1: Arrow and South Arrow Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for the first twenty holes comprising 8,216.5 m from the Company’s first phase of Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. read more

NexGen Announces Appointment of Brad Wall, the Former Premier of Saskatchewan, to its Board of Directors

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to announce the appointment of former Saskatchewan Premier Mr. Brad Wall to the Company’s Board of Directors. This appointment coincides with the retirement from the NexGen Board of Craig Parry, Chief Executive Officer of IsoEnergy and founding member of the Board of Directors at NexGen, who is moving onto the Technical Advisory Committee. read more

Skyharbour Partner Company Azincourt Energy Commences Drilling at East Preston Project in Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has commenced phase one of its diamond drilling at the East Preston Uranium Project, in the western Athabasca Basin, northern Saskatchewan. read more

Skyharbour Partner Company Azincourt Energy Mobilizes Crew for Drill Program and Completes VTEM Survey at East Preston, Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has received all relevant permits for its proposed uranium drill program at the East Preston Project. Crews have now been mobilized in support of the program with drilling expected to commence before mid-March. read more

NexGen Releases Results from Shaft Pilot Hole Report and Assays from the Development Drilling Summer 2018 Program

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drilling Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to report geotechnical results for the initial shaft pilot holes and assays for all twenty-nine holes comprising 20,482.31 m, drilled during the summer development program on the Company’s 100% owned Rook I property, in the Athabasca Basin, Saskatchewan. read more

Skyharbour Option Partner Orano Canada Commences Winter Diamond Drill Program at Preston Uranium Project

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that the Company’s option partner Orano Canada Inc. (“Orano Canada”) has commenced a planned 3,600 metre winter diamond drill program at the Preston Uranium Project. The project is located in the western Athabasca Basin near NexGen Energy Ltd.’s high-grade Arrow deposit hosted on its Rook-1 property and Fission Uranium Corp.’s Triple R deposit located within their PLS Project area. read more

NexGen Commences 125,000 m Feasibility Stage Drilling Program and Technical Studies at the Arrow Deposit

T.NXE, NexGen, uranium
Figure 1: Focus of Objective 1 and 2 Drilling (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to announce that the largest drill program in the Company’s history focused on optimizing mine development has begun at our 100% owned, Rook I property, in the Athabasca Basin, Saskatchewan. The drill program results will be incorporated into a NI43-101 Bankable Feasibility Study (“FS” or the “Study”), building on the successful outcomes highlighted in the Company’s Pre-Feasibility Study (“PFS”) (see News Release dated November 5, 2018) which demonstrated the Arrow Project to be an exceptional development opportunity for NexGen, Saskatchewan and Canada. read more

Skyharbour Intersects New High Grade Uranium at Maverick Zone including 3.11% U3O8 over 1.8m within 0.56% U3O8 over 15.2m as well as 1.33% U3O8 over 7.8m; Winter 2019 Drill Program Upcoming

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. (TSX-V: SYH)(OTCQB: SYHBF)(Frankfurt:SC1P) (the “Company”) is pleased to announce the results from its 2018 fall diamond drilling program at its 100% owned, flagship 35,705 hectare Moore Uranium Project, located approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure on the southeast side of the Athabasca Basin, Saskatchewan. Drillhole ML18-14 intersected high grade uranium mineralization within the Main Maverick Zone consisting of 3.11% U3O8 over 1.8 metres within an intercept containing 0.56% U3O8 over 15.2 metres. This represents one of the broadest zones of uranium mineralization intersected on the property to date and occurs from 264.5 metres to 279.7 metres downhole, and largely within the underlying basement rocks. Of particular note is that the uranium mineralization continues well into the basement rock in the above reported intercept illustrating the strong discovery potential below the unconformity. read more