Marathon Gold Reports Additional Drill Results from Marathon Deposit at Valentine Gold Project, NL

Results Targeting Marathon SW Main Zone Include 3.99 g/t Au over 29.0m, 3.94 g/t Au over 20.0m, 2.17 g/t Au over 52.0m and 2.25 g/t Au over 18.0m.
T.MOZ, Marathon Gold
October 17, 2019 Drill Map

 Marathon Gold Corporation (“Marathon” or the “Company”) (TSX: MOZ) is pleased to report an additional tranche of consistent and positive results from the ongoing infill drilling campaign at the Marathon Deposit, part of the Valentine Gold Project in central Newfoundland. The new drilling continues to delineate significant new zones of Quartz-Tourmaline-Pyrite-Gold (“QTP-Au”) veining in areas of limited previous drilling within the southwestern area of the planned Marathon open pit (Figures 2 and 3). Highlights of the latest drilling include: read more