Eloro Resources Continues to Expand Higher-Grade Tin and Silver Mineralization in Step-Out Definition Drilling at its Iska Iska Project, Potosí Department, Bolivia

DSB-78, a step-out hole 75m southwest of discovery hole DSB-72, intersected a higher-grade tin zone grading 0.40% Sn over 79.50m beginning at 319.60m, including a higher-grade section of 0.89% Sn over 16.50m beginning at 366.10m. Further downhole, it intersected 0.57% Sn over 25.50m beginning at 486.10m, including a section grading 0.90% Sn over 13.50m beginning at 495.10m. Hole DSB-79, a step-out hole collared 75m southwest of hole DSB-64, intersected both silver- and tin-enriched zones. Higher-grade silver grading 52.73 g/t Ag over 43.50m occurs from 214.10m, including 401.65 g/t Ag over 3.00m beginning at 244.10m. Further down hole a number of higher grade tin intersections were returned including: 0.43% Sn over 3.00m beginning at 404.60m, 0.31% Sn over 9.00m beginning at 418.10m, 0.72% Sn over 4.50m beginning at 454.10m, 0,21% Sn over 6.00m beginning at 440.60m, and 0.28% Sn over 1.50m beginning at 472.10m. DSB-81, a step-out hole 50m southwest of hole DSB-35, intersected 0.18% Sn over 57.00m beginning at 9.60m, including higher grade sections of 0.33% Sn over 6.00m beginning at 9.6m and 0.32% Sn over 6.00m beginning at 44.10m. Hole DSB-82 drilled 50m northeast of hole DSB-35 intersected 0.16% Sn and 14.19 g/t Ag over 15.00m beginning at 97.80m. It also intersected 0.23% Sn over 12.00m beginning at 472.80m. DSB-83 drilled 135m northeast of discovery hole DSB-72, intersected a number of significant silver and tin intervals: 39.43 g/t Ag over 31.50m beginning at 52.30m, including 43.53 g/t Ag over 25.50m beginning at 52.30m. 51.24 g/t Ag over 25.50m beginning at 313.50m, including 69.22 g/t Ag over 13.50m beginning at 315.00m. 0.39% Sn and 33.62 g/t Ag over 49.50m beginning at 349.50m, including 0.84% Sn over 3.75m beginning at 367.50m, and 1.10% Sn over 6.00m beginning at 390.00m. 0.22% Sn over 15.00m beginning at 408.00m. 0.23% Sn over 6.00m beginning at 457.50m. 37.91 g/t Ag over 16.50m beginning at 513.00m, including 87.00 g/t Ag over 4.50m beginning at 513.00m. 0.29% Sn over 1.50m beginning at 540.00m. Note: True width is approximately 80% of core length. Silver equivalent (Ag eq) grades are calculated using 3-year average metal prices of Ag = US$24.14/oz, Zn = US$1.36/lb , Pb = 0.98/lb and Sn = US$13.74/lb, and preliminary metallurgical recoveries of Ag = 88%, Zn = 87%, Pb= 80% and Sn = 50%. In selecting intervals, a cutoff grade of 30 g Ag eq/t has been used. Lower grade material may be included in intersections where geological continuity is warranted. Results from the first 5 diamond drillholes from the restart definition drill program has significantly expanded the higher-grade tin mineralization and the shallower higher grade silver mineralized zone which is above the tin zone. The tin mineralization is extended at least 100m laterally beyond the known mineralization in the western part of the Santa Barbara zone and remains open along strike.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Location Map of Definition Diamond Drill Holes, Santa Barbara zone, Iska Iska. The yellow circles highlight the location of holes DSB-78, DSB-79, DSB-81, DSB-82 and DSB-83 referred to in this release.

Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from the first five (5) drillholes of the restart phase definition diamond drilling program in the predominant tin domain potential Santa Barbara starter pit area in the Iska Iska silver-tin polymetallic project in the Potosi Department of southwestern Bolivia. A total of 2,871.4m of diamond drilling has been completed in these five (5) holes with assays pending for the remaining three holes totalling 1,413.90m. Figure 1 shows the location of drill holes reported, Table 1 lists significant assay results and Table 2 lists drill hole coordinates. read more