Rye Patch Gold Announces Florida Canyon Q4 2017 Production
10,470 OUNCES OF GOLD PRODUCED

10,470 OUNCES OF GOLD PRODUCED


10,470 OUNCES OF GOLD PRODUCED

VANCOUVER, BRITISH COLUMBIA / January 5, 2018 / MGX Minerals Inc. (“MGX” or the “Company”) (CSE: XMG / FKT: 1MG / OTCQB: MGXMF) is pleased to report that joint venture partner Power Metals Corp. (“Power Metals”) has announced additional drill results for the Main Dyke at Case Lake, Cochrane, Ontario.

VANCOUVER, BRITISH COLUMBIA / TheNewswire / January 4, 2018 / MGX Minerals Inc. (“MGX” or the “Company”) (CSE: XMG / OTCQB: MGXMF / FKT: 1MG) is pleased to report the Company has increased its ownership in engineering partner PurLucid Treatment Solutions (“PurLucid”) from 34% to 46% by investment of C$1.45M. The Company maintains the right to acquire 100% of PurLucid through successive future investments.

VANCOUVER, British Columbia, Jan. 03, 2018 (GLOBE NEWSWIRE) — Argentina Lithium & Energy Corp. (TSX-V:LIT) (FSE:OAY1) (WKN:A0RK7E) (OTC:PNXLF), “Argentina Lithium” or the “Company”) is pleased to provide an update with respect to the completion of its private placement (the “Private Placement”). This Private Placement was announced November 21, 2017 and completion of the 1st Tranche was announced on December 21, 2017. The Company anticipates closing the 2nd and final Tranche during the week of January 15, 2018.


VANCOUVER, Jan. 3, 2018 /CNW/ – Rye Patch Gold Corp. (TSX.V: RPM; OTCQX: RPMGF; FWB: 5TN) (the “Company” or “Rye Patch”) reports that in December, 2017, the Company completed its US$4.0 million principal repayment and paid US$609,000 in interest pursuant to its credit agreement with Macquarie Bank Limited. An aggregate of US$5.1 million in principal repayments was made in 2017, reducing the outstanding principal balance to US$21.8 million. The credit facility was used in the construction and re-start of the Company’s flagship Florida Canyon mine in Pershing County, Nevada.

January 2, 2018 – MGX Minerals Inc.(“MGX” or the “Company”) (CSE: XMG / OTCQB: MGXMF / FKT: 1MG) is pleased to announce that the site survey, in preparation for 3D seismic geophysics, at the Company’s Paradox Basin Petrolithium Project, has been completed. The site survey covers the Company’s Blueberry Unit within its Utah Petrolithium portfolio (the “Project”). The survey includes approximately 9,000 source points. The purpose of the geophysical survey is to outline subsurface geological formations and structures favorable for accumulations of oil and gas as well as lithium brine bearing formations.


TORONTO, Dec. 29, 2017 /CNW/ – Sierra Metals Inc. (TSX: SMT) (BVL: SMT) (NYSE AMERICAN: SMTS) (“Sierra Metals” or “the Company”) has updated its Mineral Resource Estimate at the Company’s Cusi Mine, located in Chihuahua State, Mexico.

MGX Minerals Inc. (“MGX” or the “Company”) (CSE: XMG / FKT: 1MG / OTC: MGXMF) is pleased to announce that it has closed the second and final tranche of a non-brokered, private placement for 2,434,716 flow through units (“FT Units”) at a price of $1.05 per FT Unit for gross proceeds of $2,556,451.80 (the “Offering”). The aggregate gross proceeds raised under the Offering was $5,803,253.40 through the issuance of an aggregate of 5,526,908 FT Units. The FT Offering was made concurrently with a private placement of non flow through units (“NFT Units”), which raised aggregate gross proceeds of $7,137,000 (see press release dated December 21, 2017).