Eloro Resources Reports the Longest and Highest-Grade Tin Intersection Obtained thus far in Drilling at its Iska Iska Project, Potosí Department, Bolivia with 213.00 Metres Grading 0.51% Tin (Sn)

Highlights: DSB-87, an infill hole drilled 150m southeast of discovery hole DSB-72, intersected 213.00m grading 0.51% Sn and 25.46 g/t Ag within a broader interval of 241.50m grading 0.47% Sn and 23.17 g/t Ag, beginning at 26.10m, including 1.18% Sn over 34.50m, beginning at 62.10m. This is the longest and highest-grade tin intersection obtained thus far in drilling at Iska Iska. Hole DSB-87 also includes higher-grade sections of: 238.40 g/t Ag and 1.55% Sn over 4.50m, beginning at 150.60m, and 0.64% Zn over 54.00m, beginning at 267.60m. DSB-80, a step-out hole collared 75m southwest of hole DSB-76, intersected several higher-grade silver, tin, gold and zinc intervals: 53.10g/t Ag over 15.00m, beginning at 340.50m 30 g/t Ag over 9.00m, beginning at 445.50m, 34.50 g/t Ag over 10.50m, beginning at 460.50m, 0.30% Sn and 3.01 g/t Au over 0.75m beginning at 516.00m, 1.44% Zn over 6.00m beginning at 231.00m and 41.13 g/t Ag and 2.36% Zn over 6.00m beginning at 250.50m. Hole DSB-84, a step-out hole 50m southwest of hole DSB-35, intersected higher-grade tin and silver intervals, including: 31.62 g/t Ag over 16.50m, beginning at 109.00m, including 108.80 g/t Ag over 3.00m, beginning at 109.00m 34.85 g/t Ag over 3.00m, beginning at 122.50m 67.70 g/t Ag and 0.21% Sn over 4.50m beginning at 214.00m. DSB-85, a step-out hole drilled 125m southwest of hole DSB-79 intersected a number of higher-grade tin and silver intervals: 38.26 g/t Ag over 22.50m, beginning at 58.50m, including 65.60 g/t Ag over 10.50m, beginning at 58.50m 68.36 g/t Ag over 10.50m, beginning at 136.50m 198.08 g/t Ag over 9.00m, beginning at 166.50m 92.40 g/t Ag and 0.22% Sn over 6.00m, beginning at 186.00m 0.79% Sn over 3.00m, beginning at 196.50m 80.32 g/t Ag and 0.29% Sn over 7.50m, beginning 307.50m 0.38% Sn over 4.50m, beginning at 379.50m 0.20% Sn over 30m, beginning at 399.00m, including 1.45% Sn over 1.50m, beginning at 399.00m and 0.36% Sn over 4.50m, beginning at 417.00m. DSB-86, a step-out hole drilled 50m northeast of hole DSB-47, intersected a very long zinc and lead interval grading 0.81% Zn and 0.80% Pb over 241.50m, beginning at 102.70m, including a higher section grading 1.56% Zn and 0.98% Pb over 100.50m, beginning at 242.20m. It also included 52.80 g/t Ag and 1.30% Pb over 7.50m, beginning at 192.70m. Further downhole it intersected 0.85% Zn over 105.00m, beginning at 344.20m and 81.00 g/t Ag over 6.00m, beginning at 497.95m. Note: True width is approximately 80% of core length. Results from the new definition drill program have further expanded the footprint of a large multi-phase hydrothermal system in the potential starter pit at Iska Iska with dimensions having increased to approximately 800m by 500m by 500m deep. The current results have increased dimensions by 100m by 100m along and across strike, compared with those previously reported.
V.ELO, Eloro Resources, Peru, gold, Tom Larsen
Location Map of Definition Diamond Drill Holes, Santa Barbara zone, Iska Iska. The yellow circles highlight the location of holes DSB-80, DSB-84, DSB-85, DSB-86 and DSB-87 referred to in this release.

Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further assay results from five (5) drillholes (DSB-80, DSB-84, DSB-85, DSB-86 and DSB-87) of the second phase definition diamond drilling program. Four of these holes are located in the Polymetallic Domain (DSB-80, DSB-84, DSB-85 and DSB-86) and one is in the Tin Domain (DSB-87), in the potential Santa Barbara starter pit area. These results have further expanded the footprint of a large multi-phase hydrothermal system in the potential starter pit with dimensions having now increased to approximately 800m by 500m by 500m deep (see Figure 1). The current results have increased dimensions by 100m by 100m along and across strike, compared with those previously reported (see Eloro’s Press Release dated August 6, 2025). To date, a total of 6,242m of diamond drilling in twelve (12) holes has been completed in the current definition drilling phase. A total of 2,346m was completed in the five (5) holes reported, with assays pending for the remaining two holes totalling 1,025m. read more