Clean Air Metals Drill Results from the Thunder Bay North Project includes 31.0m averaging 3.9 g/t Pt, 5.1 g/t Pd, 1.7% Cu, 0.63% Ni. 2022 drilling set to restart

Figure 1: 2021 Drill Hole Intercepts in the Escape Lake Deposit Area (CNW Group/Clean Air Metals Inc.)

Clean Air Metals Inc. (“Clean Air Metals” or the “Company“) (TSXV: AIR) (FRA: CKU) (OTCQB: CLRMF) is pleased to announce new assay results from the 2021 drill campaign from the Escape and Current PGE-Cu-Ni Deposits at the Company’s Thunder Bay North Project near Thunder Bay, Ontario, Canada (the “Project“). Drilling operations are set to resume on January 6, 2022. read more