Marathon Gold Reports New Drill Results from Marathon Deposit at Valentine Gold Project, NL

Results Targeting Marathon SW Main Zone Include 4.64 g/t Au over 29.0m, 3.38 g/t Au over 29.0m, 2.36 g/t Au over 39.0m and 2.22 g/t Au over 25.0m
T.MOZ, Marathon Gold
October 2, 2019 Drill Map

Marathon Gold Corporation (“Marathon” or the “Company”) (TSX: MOZis pleased to announce positive results from the ongoing infill drilling campaign at the Marathon Deposit, part of the Valentine Gold Project in central Newfoundland. The new drilling continues to successfully demonstrate the occurrence and continuity of gold mineralization both along and across strike of the 1,500-meter long “Main Zone” within the Marathon Deposit, as well as from surface to the base of the currently planned open pit, where mineralization remains open to depth. In particular, the latest results confirm significant new zones of gentle SW-dipping, en-echelon stacked Quartz-Tourmaline-Pyrite-Gold (“QTP-Au”) veining in areas of limited previous drilling within the southwestern area of the planned Marathon open pit. Highlights of the latest drilling include: read more

World Class Extractions Reports Financial Results With 59% Gross Margin for The Three-Month Period Ended July 31, 2019

C.PUMP, World-class Extractions

World-Class Extractions Inc. (“World-Class” or the “Company“) (CSE: PUMP) (FRA:WCF) is pleased to report the financial and operating results for its first quarter ended July 31, 2019. read more