NexGen Releases Second Batch of Assay Results from the 2019 Feasibility Stage Drilling Program, Intersects High-Grade Uranium in All A2 and A3 High-Grade Domain Targets

T.NXE, NexGen, uranium
Figure 1: AR-19-229c4 – High Grade A2 Intersection in Competent Host Rock (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report assay results for an additional twenty holes from the Company’s recently completed Feasibility-stage drilling program at the 100% owned, Rook I property in the Athabasca Basin, Saskatchewan. read more

NexGen Releases First Assays from Recently Completed Arrow Drilling Program Including 12.0 m at 33.78% U3O8 and 8.0 m at 32.88% U3O8

T.NXE, NexGen, uranium
Figure 1: Arrow and South Arrow Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report the first batch of assay results for twenty holes from the Company’s recently completed Phase I Feasibility-stage drilling program at the 100% owned, Rook I Project in the Athabasca Basin, Saskatchewan. read more

NexGen Commences Maiden Exploration Drilling on Prospective SW1 Property

T.NXE, NexGen, uranium
Figure 1: SW1 Property and Rook I Property with Similar Geophysical Signatures (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to announce that an exploration drill program consisting of a minimum 4,000 m is scheduled to begin in early September at our 100% owned, SW1 property (approximately 10 km northwest of Rook I), in the Athabasca Basin, Saskatchewan. read more

NexGen Completes Phase I of Feasibility-Stage Drill Program Intersecting High Grade Mineralization and Preliminarily Assessed Robust Geotechnical and Hydrogeological Conditions in all Areas of Arrow

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for an additional thirty-seven holes comprising 16,585.5 m from the Company’s Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. The Phase I resource component of the 2019 Feasibility stage program has completed 117 holes totaling 50,968 m.  Utilizing new directional drilling technology, AziDrill, the Company was able to reduce the metres required for Phase I conversion by 28% due to the ability to target mineralization more accurately with deeper directional cuts from the pilot hole. read more

NexGen Intersects High-Grade Mineralization in all Twenty A2 and A3 Targets from the 2019 Feasibility Stage Drilling Program

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity for an additional twenty holes comprising 7,969.5 m from the Company’s Feasibility stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. read more

NexGen Announces the Commencement of an Environmental Assessment for the Rook I Project

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT:NXE) is pleased to announce the acceptance of a Project Description (Technical Proposal) by the Canadian Nuclear Safety Commission (“CNSC”) and the Saskatchewan Ministry of Environment (“MOE”). The acceptance marks the commencement of an Environmental Assessment (“EA”) on the Rook I Project (the “Project”) in accordance with the requirements of both The Environmental Assessment Act (Province of Saskatchewan) and the Canadian Environmental Assessment Act, 2012 “CEAA 2012” (Government of Canada). The EA will be conducted through a coordinated process between the MOE and the CNSC, which is the Federal life-cycle regulator for all uranium mine and mill projects in Canada. read more

NexGen Intersects Continuous and Strong High-Grade Mineralization in all of the Initial A2 Sub-Zone Targets from Feasibility Stage Drilling

T.NXE, NexGen, uranium
Figure 1: Arrow and South Arrow Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for the first twenty holes comprising 8,216.5 m from the Company’s first phase of Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. read more

NexGen Announces Appointment of Brad Wall, the Former Premier of Saskatchewan, to its Board of Directors

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to announce the appointment of former Saskatchewan Premier Mr. Brad Wall to the Company’s Board of Directors. This appointment coincides with the retirement from the NexGen Board of Craig Parry, Chief Executive Officer of IsoEnergy and founding member of the Board of Directors at NexGen, who is moving onto the Technical Advisory Committee. read more

Skyharbour Partner Company Azincourt Energy Mobilizes Crew for Drill Program and Completes VTEM Survey at East Preston, Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has received all relevant permits for its proposed uranium drill program at the East Preston Project. Crews have now been mobilized in support of the program with drilling expected to commence before mid-March. read more

NexGen Releases Results from Shaft Pilot Hole Report and Assays from the Development Drilling Summer 2018 Program

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drilling Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to report geotechnical results for the initial shaft pilot holes and assays for all twenty-nine holes comprising 20,482.31 m, drilled during the summer development program on the Company’s 100% owned Rook I property, in the Athabasca Basin, Saskatchewan. read more