NexGen Announces Expanded 2023 Exploration Program

T.NXE, NexGen, uranium
Figure 1: 2023 drill target areas (highlighted blue) across prospective corridors on the western half of NexGen’s SW2 property. (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce the commencement of an expanded 2023 exploration program designed to follow-up positive results from the 2022 exploration drill program and to test prospective areas that have been highlighted by detailed 2022 geophysical surveys. Additionally, NexGen has planned a substantial geophysical program in 2023 for drill target generation across high priority areas of NexGen’s mineral tenure (SW1, SW2 and SW3) in the southwest Athabasca Basin, Saskatchewan. The geophysical program includes cosmic ray muon tomography initiated in 2022 on the Patterson Corridor at NexGen’s 100% owned Rook I property as part of Ideon Technologies’ early access program for first implementation of innovative muon detecting instrumentation in boreholes. read more

NexGen 2021 Drilling Assay Results Confirm Uranium Mineralization Below Arrow At Depth and Commencement of 2022 Regional Exploration Program

T.NXE, NexGen, uranium
Figure 1: 2022 Exploration Target Areas (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce drill assays from 2021 confirm discovery of a uranium mineralized zone below the known Arrow Deposit and at Camp East: read more

Canadian Nuclear Safety Commission Approves NexGen Draft EIS to Proceed to Technical Review

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce that on July 12, 2022, the Canadian Nuclear Safety Commission (“CNSC”) announced their acceptance of the draft Environmental Impact Statement (the “EIS”) which the Company completed submission of in June 2022 (see News Release dated June 21, 2022). The acceptance of the draft EIS for NexGen’s 100% owned Rook I Project (“Rook I” or the “Project”) located in Saskatchewan’s southwestern Athabasca Basin follows a 30-day period during which the CNSC conducted a conformance review of the draft EIS submission and confirmed no comments or conditions.  Further, the acceptance marks the formal commencement of the 90-day period during which the CNSC will coordinate both the Federal technical and public review of the draft EIS. read more

NexGen to Webcast Annual General Meeting and Presentation by Management on June 23, 2022

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) announces that that in consideration of the ongoing COVID environment, the Company will be providing a webcast facility in addition to the previously announced teleconference facility.  NexGen strongly encourages participants to follow the conduct of the Annual General Meeting (“AGM”) via these facilities. read more

NexGen Announces Submission of the Rook I Project Environmental Impact Statement

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce a major milestone in the advancement of regulatory approvals for the 100% owned Rook I Project (“Rook I” or the “Project”) with the submission of the draft Environmental Impact Statement (“EIS”) to the Saskatchewan Ministry of Environment (“ENV”) and the Canadian Nuclear Safety Commission (“CNSC”). The EIS submission included letters of support for the Project from each of the Clearwater River Dene Nation (CRDN), Birch Narrows Dene Nation (BNDN), and Buffalo River Dene Nation (BRDN), which all have also endorsed the Project through the execution of Benefit Agreements with NexGen covering the entire lifespan of the Project. read more

NexGen Announces Uplisting on the New York Stock Exchange

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce that it has been approved for uplisting on the New York Stock Exchange (“NYSE”) from its current listing on the NYSE American LLC (“NYSE American”).  The Company’s common stock will begin trading under the symbol “NXE” at the opening of trading on March 4, 2022. read more

NexGen Reports 2021 Exploration and Site Geotechnical Confirmation Drilling Results

T.NXE, NexGen, uranium
Figure 1: 2021 Exploration – Drill holes Completed (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce radioactivity results and the completion of the 2021 field programs that focused on exploration and a detailed geotechnical site confirmation program at the Arrow Deposit (“Arrow” or the “Project”) at the 100% owned, Rook I property, in the Athabasca Basin, Saskatchewan. read more

NexGen Awards Hatch EPCM Contract as Front-End Engineering Design (“FEED”) for the Rook I Project Commences

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce that the Company has awarded the engineering, procurement, and construction management (“EPCM”) contract for the FEED stage of the Rook I Project to Hatch with work well underway.  Hatch is a global leader in project management and engineering with extensive experience delivering mining projects in Saskatchewan and across Canada. read more

NexGen Releases Inaugural Sustainability Report

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce the release of its inaugural Sustainability Report, available online on the Company’s website nexgenenergy.ca in the Responsible Development section. The 2020 report provides a comprehensive overview of NexGen’s commitment and approach to maximizing value for all stakeholders and outlines the five key areas of focus that have been identified as foundational to NexGen’s responsible growth strategy. read more