Tocvan Drills 108.6-meters of 0.8 g/t Au, including 9.4-meters of 7.6 g/t Au in 125-meter Step-Out at Pilar. Discovers New Main Zone Extension

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC); (OTC:TCVNF); (FSE:TV3), is pleased to announce drill results from its Pilar Au-Ag Project in Sonora, Mexico. Results for core drill hole JES-22-62 are provided in this release, a 125m southeast step-out from hole JES-22-59 (116.9m at 1.2 g/t Au), infilling a gap 100m west of hole JES 21-47 (47.3m at 0.7 g/t Au, see Figure 1). JES-22-62 returned 108.6-meters at 0.8 g/t Au and 3 g/t Ag, including 31.9-meters at 2.4 g/t Au and 2 g/t Ag. Within the broader mineralized interval, consistent high-grade gold mineralization was recorded within a silicified sulphide-bearing breccia returning 9.4-meters at 7.6 g/t Au and 5 g/t Ag (see Table 2). read more

Tocvan Drills 116.9-meters of 1.2 g/t Au and 7 g/t Ag, including 10.2-meters of 12 g/t Au and 23 g/t Ag at Pilar.

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC); (OTC:TCVNF); (FSE:TV3), is pleased to announce drill results from its Pilar Au-Ag Project in Sonora, Mexico. Results for drill hole JES-22-59 are provided in this release, a core twin of RC drill hole JES-20-32 which returned 94.6-meters at 1.6 g/t Au (see Figure 1). Drill hole JES-22-59 was previously mentioned in a news release (see NR February 15, 2022) where a mineralized breccia host was observed in drill core correlating to the Main Zone at Pilar. JES-22-59 returned 116.9-meters at 1.2 g/t Au and 7 g/t Ag, including an impressive 48.1-meters at 2.8 g/t Au and 9 g/t Ag. High-grade gold-silver mineralization was recorded adjacent to a heavily faulted and altered zone returning 10.2-meters at 12.0 g/t Au and 23 g/t Ag, including 4.2-meters at 28.3 g/t Au and 49 g/t Ag. read more

Tocvan Drills 21.7-meters of 0.94 g/t Oxide Au including 4.0-meters of 4.3 g/t Au and 7 g/t Ag at Pilar.

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC); (OTC:TCVNF); (FSE:TV3), is pleased to announce initial drill results from its Pilar Au-Ag Project in Sonora, Mexico. Results for the first three drill holes are provided in this release, totaling 513.3 meters of drilling within the Main Zone (see Figure 1). A total of 1,540 meters of Phase III drilling has been completed in nine drill holes providing key information across the Main Zone and 4-T Trend. Drill hole JES-22-58 intersected 21.7-meters of 0.94 g/t Au, including 4.0 meters of 4.3 g/t Au and 7 g/t Ag. JES-22-58 was a diamond drill hole to confirm host rock and structure from the local Reverse Circulation (“RC”) drill hole JES-20-36 which intersected 24.4 meters of 2.5 g/t Au and 73 g/t Ag, including a high-grade interval of 1.5 meters of 33.4 g/t Au and 1,090 g/t Ag. read more

Tocvan Completes First Stage of Phase III Drilling. Provides Update Prior to Release of Drill Results.

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (CNSX:TOC.CN) (OTC:TCVNF) (FSE:TV3), is pleased to provide an update from its Pilar Au-Ag Project in Sonora, Mexico. 1,500 meters of Phase III drilling has been completed in nine drill holes providing essential information across the Main Zone and 4-T Trend (see Figure 1). All samples have been submitted to ALS (Hermosillo) for preparation and analysis and will start to be released imminently. read more

TOCVAN Closes Unit Private Placement

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC); (OTC:TCVNF); (WKN:TV3/A2PE64),  is pleased to announce that it has closed its previously announced non-brokered private placement of units (“Units”) for gross proceeds of $360,803 (the “Offering”).  The Offering consisted of the issuance of an aggregate of 481,071 Units at a price of $0.75 per Unit.  Each Unit consists of one common share (“Common Share”) in the capital of the Company and one common share purchase warrant (“Warrant”). Each Warrant entitles the holder thereof to acquire one Common Share at a price of $1.35, for a period of 18 months from the closing of the Offering.
In connection with the Offering, the Company paid aggregate cash commissions to arm’s length finders who assisted with the Offering of approximately $14,322 and issued 19,096 finder warrants (“Finder Warrants”). Each Finder Warrant is exercisable at a price of
$0.75 per Common Share for a period of 18 months from the closing of the Offering. read more

Tocvan Provides Corporate Update. Drill Results at Pilar Pending.

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (CNSX:TOC.CN) (OTC:TCVNF) (FSE:TV3), is pleased to provide an update from its Pilar Au-Ag Project in Sonora, Mexico. Phase III drilling is currently in progress, 1,200 meters of core drilling has been completed providing essential information across the Main Zone and 4-T Trend. Over 40% of these samples have been submitted to ALS (Hermosillo) for preparation and analysis. The remaining samples are expected to be submitted over the next two weeks with more drilling planned in the coming months. The company expects first results to be available later this month, including results from the previously announced (see February 15, 2022, announcement) intersection of silicified breccia host through the Main Zone, a core twin of RC hole JES-20-32 which returned 94.6 meters of 1.6 g/t Au, including 9.2 meters of 10.8 g/t Au and 38 g/t Ag. Five (5) metallurgical samples for column leach study have been submitted for analysis by SGS and a strategic partner. Results for metallurgy are expected to be available in Q2 2022. 2021 bottle roll studies returned over 90% recovery of gold after a 48-hour retention time. read more

Tocvan Announces Private Placement

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (OTCQB:TCVNF) (WKN:TV3/A2PE64), is pleased to announce it will be proceeding with a non-brokered private placement of up to 666,667 units (the “Units”) at CAD $0.90 per Unit for gross proceeds of up to CAD $600,000 (the “Offering”).  Each Unit is comprised of one common share of the Company (a “Share”) and one common share purchase warrant (a “Warrant”). Each Warrant will entitle the holder to acquire one additional Share in the capital of the Company at a price of CAD $1.35 for a period of 18 months from the date the Units are issued, subject to the accelerated expiry provision described in the notes below. read more

Tocvan Releases Surface Exploration Results Identifying Undrilled High-Grade Au-Ag Target Zones Highlighted By: 9.2 g/t Au and 279 g/t Ag; 6.6 g/t Au and 433 g/t Ag; and 1.3 g/t Au and 524 g/t Ag

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (CNSX:TOC.CN) (OTC:TCVNF) (FSE:TV3), is pleased to announce surface sample results from its Pilar Au-Ag Project in Sonora, Mexico. A surface exploration program was conducted in December following-up on target areas identified earlier in 2021. A total of 59 samples were collected with 21 samples returning values  greater than 0.5 g/t Au (Table 1). Sampling defined several new target areas yet to be drilled. The Main Zone has been expanded with high-grade Au-Ag values (9.2 g/t Au and 279 g/t Ag) along the southeast extent hosted in a silicified quartz vein breccia. The 4-T Trend has been extended to the southeast 100-meters with high-grade Au-Ag values, highlighted by 6.6 g/t Au and 433 g/t Ag hosted in a strongly silicified fault. A new vein corridor identified by several artisanal workings and shafts over a 200-meter strike has returned high-grade silver values highlighted by 524 g/t Ag and 1.3 g/t Au hosted in a silicified quartz vein breccia. In addition, mineralization has been identified further to the south (300-meters) highlighted by 3.1 g/t Au and 27 g/t Ag. read more

Tocvan Channel Samples 19.8 meters of 0.73 g/t Au and 19.5 meters of 0.61 g/t Au, Releases Trench Program Results

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (CNSX:TOC.CN) (OTCQB:TCVNF) (WKN:TV3/A2PE64), is pleased to announce trench results from its Pilar Au-Ag Project in Sonora, Mexico. A total of four trenches were completed in December, 2021 totalling 80 meters length. All four trenches intersected mineralization with two trenches yielding consistent mineralization across the entire length of the trench. T-21-2, intersected 19.5 meters of 0.61 g/t Au across the entire length of the trench in an area along the developing 4-Trench Trend. T-21-3, yielded 19.8 meters of 0.73 g/t Au and was targeted to provide key geochemical information across the Main Zone where mineralization outcrops at surface. Initial bulk-sample material from T-21-3 will be submitted to SGS Laboratories in Durango, Mexico and used for column leach studies. Follow-up metallurgical studies will utilize the surface material extracted from the other three trenches. read more

Tocvan Announces Change to Executive Management Team, Transitions Leadership Towards Development Focus

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (CNSX:TOC.CN) (OTC:TCVNF) (WKN:TV3/A2PE64), announces strategic changes to executive management as it proactively looks towards the advancement of its core gold-silver assets in Sonora, Mexico. Mr. Brodie A. Sutherland, VP Exploration will replace co-founder, Mr. Derek A. Wood as President, CEO and Corporate Secretary. Mr. Wood will remain a director and strategic advisor of the Company. The changes will better align with technical and professional expertise required as projects advance towards development. read more