NexGen Releases First Assays from Recently Completed Arrow Drilling Program Including 12.0 m at 33.78% U3O8 and 8.0 m at 32.88% U3O8

T.NXE, NexGen, uranium
Figure 1: Arrow and South Arrow Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report the first batch of assay results for twenty holes from the Company’s recently completed Phase I Feasibility-stage drilling program at the 100% owned, Rook I Project in the Athabasca Basin, Saskatchewan. read more

NexGen Commences Maiden Exploration Drilling on Prospective SW1 Property

T.NXE, NexGen, uranium
Figure 1: SW1 Property and Rook I Property with Similar Geophysical Signatures (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to announce that an exploration drill program consisting of a minimum 4,000 m is scheduled to begin in early September at our 100% owned, SW1 property (approximately 10 km northwest of Rook I), in the Athabasca Basin, Saskatchewan. read more

NexGen Completes Phase I of Feasibility-Stage Drill Program Intersecting High Grade Mineralization and Preliminarily Assessed Robust Geotechnical and Hydrogeological Conditions in all Areas of Arrow

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for an additional thirty-seven holes comprising 16,585.5 m from the Company’s Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. The Phase I resource component of the 2019 Feasibility stage program has completed 117 holes totaling 50,968 m.  Utilizing new directional drilling technology, AziDrill, the Company was able to reduce the metres required for Phase I conversion by 28% due to the ability to target mineralization more accurately with deeper directional cuts from the pilot hole. read more

NexGen Continues to Intersect High-Grade Mineralization in all A2 and A3 Targets Highlighting Strength of Continuity at Arrow

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

 NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for an additional forty holes comprising 18,166.5 m from the Company’s Feasibility stage drilling program at our 100% owned, Rook I property in the Athabasca Basin, Saskatchewan. read more

NexGen Announces Election of Directors and Voting Results from Annual Meeting of Shareholders

T.NXE, NexGen, uranium

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX:NXE, NYSE MKT:NXE) is pleased to announce all business items considered at it’s Annual Meeting of Shareholders held on June 6, 2019 (the “Meeting) were passed, with a total of 221,357,028 representing 62.84% of the Company’s total shares outstanding.  The details of the proxy voting for directors are set out below: read more

NexGen Intersects High-Grade Mineralization in all Twenty A2 and A3 Targets from the 2019 Feasibility Stage Drilling Program

T.NXE, NexGen, uranium
Figure 1: Arrow Deposit Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity for an additional twenty holes comprising 7,969.5 m from the Company’s Feasibility stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. read more

Skyharbour Partner Company Azincourt VTEM Survey Completed and Adds to East Preston Prospectivity

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has preliminary results from the recent helicopter-borne Versatile Time-Domain Electromagnetic (VTEM™ Max) and Magnetic survey conducted over the southeastern portion of the East Preston Uranium Project, located in the western Athabasca Basin, Saskatchewan. read more

NexGen Intersects Continuous and Strong High-Grade Mineralization in all of the Initial A2 Sub-Zone Targets from Feasibility Stage Drilling

T.NXE, NexGen, uranium
Figure 1: Arrow and South Arrow Drill Hole Locations (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE, NYSE MKT: NXE) is pleased to report radioactivity results for the first twenty holes comprising 8,216.5 m from the Company’s first phase of Feasibility-stage drilling program at our 100% owned, Rook I property in the Athabasca Basin Saskatchewan. read more

Skyharbour Partner Company Azincourt Energy Commences Drilling at East Preston Project in Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has commenced phase one of its diamond drilling at the East Preston Uranium Project, in the western Athabasca Basin, northern Saskatchewan. read more

Skyharbour Partner Company Azincourt Energy Mobilizes Crew for Drill Program and Completes VTEM Survey at East Preston, Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has received all relevant permits for its proposed uranium drill program at the East Preston Project. Crews have now been mobilized in support of the program with drilling expected to commence before mid-March. read more