Eloro Resources Intersects 57.62g Ag/t, 1.26% Zn, 0.94% Pb and 0.12% Sn (139.94g Ag eq/t) over 136.11m in Definition Drilling at the Iska Iska Project, Potosi Department, Southwestern Bolivia

Hole DSB-66 above also returned other well mineralized intersections including: 24.67g Ag/t, 1.08% Zn, 0.83% Pb and 0.08% Sn (94.46g Ag eq/t) over 86.39m, and 7.46g Ag/t, 2.51% Zn, 1.02% Pb and 0.06% Sn (129.90g Ag eq/t) over 74.85m Hole DSB-65 intersected 118.86g Ag/t*, 0.35% Zn, 0.35% Pb and 0.15% Sn (152.29g Ag eq/t*) over 81.28m including a very high-grade sample of: 5,080g Ag/t, 0.12 g Au/t, 0.26% Zn, 1.34% Pb, 1.53% Cu and 1.27% Sn (4,746.46g Ag eq/t) over 1.46m This very high-grade sample highlights the potential for Iska Iska to host extraordinary grades within the overall extensive mineralized system. Hole DSB-63, the eastern most hole in the definition drill program, intersected a significant Sn intersection of 23.37 g Ag/t, 1.77% Zn. 1.22% Pb and 0.51% Sn (205.57g Ag eq/t) over 23.02m. This area is in the Polymetallic (Ag-Zn-Pb) Domain where Sn values have typically been low. This suggests potential to extend the higher-grade Sn zone further east. The definition drill program has expanded both the higher-grade Sn and Ag zones especially to the west where there has been only limited previous drilling. These new data highlight the potential to upgrade and expand the mineral resource particularly by outlining a significant higher-grade Sn resource to include for consideration in the preliminary economic assessment (“PEA”). * Cutting of this very high Ag sample to 1,000g Ag/t, based on a statistical probability plot, yields a still high average for the 81.28m interval of 45.58 g Ag/t with an overall grade of 87.80 g Ag eq/t
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Location Map of Definition Drill Holes, Santa Barbara, Iska Iska.  Holes in this release are highlighted in yellow circles.

Eloro Resources Ltd. (TSX: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce the final assay results for the last six (6) diamond drill holes in its eleven (11) hole 5,267.7m definition drill program on the Iska Iska silver-tin polymetallic project in the Potosi Department of southwestern Bolivia. read more