Tocvan Drills 21.7-meters of 0.94 g/t Oxide Au including 4.0-meters of 4.3 g/t Au and 7 g/t Ag at Pilar.

CSE:TOC, TocVan Ventures, gold, mexico

Tocvan Ventures Corp. (the “Company”) (CSE:TOC); (OTC:TCVNF); (FSE:TV3), is pleased to announce initial drill results from its Pilar Au-Ag Project in Sonora, Mexico. Results for the first three drill holes are provided in this release, totaling 513.3 meters of drilling within the Main Zone (see Figure 1). A total of 1,540 meters of Phase III drilling has been completed in nine drill holes providing key information across the Main Zone and 4-T Trend. Drill hole JES-22-58 intersected 21.7-meters of 0.94 g/t Au, including 4.0 meters of 4.3 g/t Au and 7 g/t Ag. JES-22-58 was a diamond drill hole to confirm host rock and structure from the local Reverse Circulation (“RC”) drill hole JES-20-36 which intersected 24.4 meters of 2.5 g/t Au and 73 g/t Ag, including a high-grade interval of 1.5 meters of 33.4 g/t Au and 1,090 g/t Ag. read more