Tocvan Provides Corporate Update. Drill Results at Pilar Pending.
Tocvan Ventures Corp. (the “Company”) (CSE:TOC) (CNSX:TOC.CN) (OTC:TCVNF) (FSE:TV3), is pleased to provide an update from its Pilar Au-Ag Project in Sonora, Mexico. Phase III drilling is currently in progress, 1,200 meters of core drilling has been completed providing essential information across the Main Zone and 4-T Trend. Over 40% of these samples have been submitted to ALS (Hermosillo) for preparation and analysis. The remaining samples are expected to be submitted over the next two weeks with more drilling planned in the coming months. The company expects first results to be available later this month, including results from the previously announced (see February 15, 2022, announcement) intersection of silicified breccia host through the Main Zone, a core twin of RC hole JES-20-32 which returned 94.6 meters of 1.6 g/t Au, including 9.2 meters of 10.8 g/t Au and 38 g/t Ag. Five (5) metallurgical samples for column leach study have been submitted for analysis by SGS and a strategic partner. Results for metallurgy are expected to be available in Q2 2022. 2021 bottle roll studies returned over 90% recovery of gold after a 48-hour retention time.