Leprechaun Open-Pit Drilling in Core of the Main Zone Corridor Hits: 4.27 g/t Au over 126.0 m, 3.02 g/t Au over 153.0 m, 4.11 g/t Au over 42.0 m and 5.06 g/t Au over 30.0 m, Valentine Gold Camp, NL May 9, 2019May 9, 2019 MotherlodeTV Drilling Highlights: read more