Argentina Lithium Provides Update on Non-Brokered Private Placement

Argentina Lithium, V.LIT

VANCOUVER, British Columbia, Jan. 03, 2018 (GLOBE NEWSWIRE) — Argentina Lithium & Energy Corp. (TSX-V:LIT) (FSE:OAY1) (WKN:A0RK7E) (OTC:PNXLF), “Argentina Lithium” or the “Company”) is pleased to provide an update with respect to the completion of its private placement (the “Private Placement”).  This Private Placement was announced November 21, 2017 and completion of the 1st Tranche was announced on December 21, 2017. The Company anticipates closing the 2nd and final Tranche during the week of January 15, 2018. read more

3D Seismic Geophysics at Paradox Basin, Utah Petrolithium Project

CSE:XMG, MGX Minerals, lithium,

January 2, 2018 – MGX Minerals Inc.(“MGX” or the “Company”) (CSE: XMG / OTCQB: MGXMF / FKT: 1MG) is pleased to announce that the site survey, in preparation for 3D seismic geophysics, at the Company’s Paradox Basin Petrolithium Project, has been completed. The site survey covers the Company’s Blueberry Unit within its Utah Petrolithium portfolio (the “Project”). The survey includes approximately 9,000 source points. The purpose of the geophysical survey is to outline subsurface geological formations and structures favorable for accumulations of oil and gas as well as lithium brine bearing formations. read more

MGX Minerals Closes $4.1 Million Second Tranche of Oversubscribed Private Placement

CSE:XMG, MGX Minerals, lithium,

MGX Minerals Inc. (“MGX” or the “Company”) (CSE: XMG / FKT: 1MG / OTC: MGXMF) is pleased to announce that is has closed the second and final tranche of a non-brokered, private placement for 4,079,000 units (“Units”) at a price of $1.00 per Unit for gross proceeds of $4,079,000 (the “Offering”). The aggregate gross proceeds raised under the Offering was $7,137,000 through the issuance of an aggregate of 7,137,000 Units. The Offering was made concurrently with a private placement of flow through units, of which a second and final tranche is also expected to close this week. read more

MGX Minerals Commences Exploration and Permitting at Kootenay and Wonah Silicon Projects; Metallurgy Process Design for Testing of Solar Grade Silicon Applicability Completed

CSE:XMG, MGX Minerals, lithium,

MGX Minerals Inc. (“MGX” or the “Company”) (CSE: XMG / OTCQB: MGXMF / FKT: 1MG) is pleased to announce development activity has commenced at its Kootenay and Wonah Silicon Projects located near Canal Flats, British Columbia. Exploration design and permitting activities have commenced. Archaeological assessment (AOA) and environmental assessment are expected to commence shortly. Infrastructure evaluation is currently underway including assessment of the bulk commodity load out facility at Canal Flats, inclusive of ten railcar siding, previously used for gypsum loading. High grade silica is the feedstock used in industrial silicon metal and solar silicon metal applications. read more

MGX Minerals Advances 110,000 Acre Petrolithium Project Paradox Basin, Utah

CSE:XMG, MGX Minerals, lithium,

MGX Minerals Inc. (“MGX” or the “Company”) (CSE: XMG / OTCQB: MGXMF / FKT: 1MG) is pleased to report that the initial ground survey is nearing completion in preparation for a detailed 3D seismic survey of its Utah Petrolithium project (the “Project”). The survey of the Project includes approximately 9,000 source points. This model will outline subsurface geological formations and structures favorable for accumulations of oil and gas as well as lithium brine bearing formations. read more

MGX Minerals to Acquire Zinc Air Battery Developer ZincNyx Energy Solutions

CSE:XMG, MGX Minerals, lithium,

MGX Minerals Inc. (“MGX” or the “Company”) (CSE: XMG / FKT: 1MG / OTCQB: MGXMF) is pleased to announce it has signed a definitive agreement (the “Agreement”) with 8230137 Canada Inc. and the minority shareholders of ZincNyx Energy Solutions, Inc. (“ZincNyx”) to acquire all the issued and outstanding shares of ZincNyx. Upon closing of the Agreement ZincNyx will become a 100% owned subsidiary of the Company. read more

MGX Minerals Closes $6.3 Million First Tranche of Non-Brokered Private Placement

CSE:XMG, MGX Minerals, lithium,

MGX Minerals Inc. (“MGX” or the “Company”) (CSE: XMG / FKT: 1MG / OTC: MGXMF) is pleased to announce, further to its news release dated November 29, 2017, it has closed the first tranche of its previously announced non-brokered private placement financing for proceeds of up to $7,500,000 (the “Offering”). read more

Advantage Lithium Completes Sale of Clayton Valley Northeast Lithium Project to Pure Energy Minerals

V.AAL, Advantage Lithium, lithium, Argentina, David Sidoo

Advantage Lithium Corp. (the “Company” or “Advantage Lithium”)                     (TSX Venture: AAL) (OTCQX: AVLIF) – is pleased to announce, further to the Company’s news release dated November 8, 2017, the Company and its exploration partner Nevada Sunrise Gold Corporation (TSXV: NEV) (“Nevada Sunrise“) (together, the “Vendors“) have completed the sale of the Clayton Northeast and Triton lithium projects (collectively, “Clayton NE“) to Pure Energy Minerals Limited of Vancouver, B.C., Canada  (TSXV: PE) (“Pure Energy“). Clayton NE is located adjacent to the Silver Peak lithium brine mine in Esmeralda County, Nevada. read more

MGX Minerals and PurLucid Treatment Solutions Announce Initial Commissioning of Rapid Lithium Recovery System, Deployment Site and Water Processing Contract

CSE:XMG, MGX Minerals, lithium,

MGX Minerals Inc. (“MGX” or the “Company”) (CSE:XMG) (FKT:1MG) (OTCQB:MGXMF) is pleased to report that engineering partner PurLucid Treatment Solutions (“PurLucid”) has partially commissioned the commercial-scale NFLi5 lithium recovery system at its new manufacturing facility in Calgary, Alberta. The pre-treatment nanoflotation and nanofiltration system is now operational with all electrical, control and pump systems in the first two stages of the process operational under constant flow. Additional mineral extraction nanofiltration components are expected to be brought online sequentially over the upcoming weeks and the system will be ready for deployment in early Q1 2018. read more