NexGen Announces Best Hole (RK-24-207) to Date and Material Expansion of Mineralized Zone at Patterson Corridor East

Figure 1: Schematic plan view of mineralized footprint at Arrow and PCE at the same stage of drilling; gravity as background with low values in blue (CNW Group/NexGen Energy Ltd.)

 NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is pleased to announce the mineralized zone at Patterson Corridor East (PCE) has materially expanded since the original discovery in the 2024 Winter Program (see NexGen News Release dated March 11, 2024). The Summer Drill Program commenced May 21st, with eight (8) out of twelve (12) drillholes intersecting mineralization to date (Figures 1 and 2, Table 1). Extensive mineralization plunges to the east with a span of 540 m along strike and 600 m vertical extent, showing wide intervals of elevated radioactivity that remain open at depth and along strike. In comparison, previously reported holes from PCE had identified two mineralized holes, 275 m apart. read more