Grid Metals Corp. Reports 1.13% Li2O over 10.7 m

Completes Resource Drilling at Donner Lake
Nickel, Manitoba, Grid Metals, GRDM.V
Grid Metals Corp., Wednesday, May 31, 2023, Press release picture
Table 1: Assay Results of the 2023 drilling at the Northwest Dyke – Donner Lake Lithium Project

 Grid Metals Corp. (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) is pleased to announce final drill results from the completion of the Northwest Dyke drill program at the Donner Lake Lithium Property in Manitoba, Canada. The Company has now received all assays from the winter drilling program which will be incorporated into the upcoming maiden resource estimate expected before the end of Q2/23. SGS Canada has been retained by the Company to complete the estimate which will include both the Main and Northwest Dykes. read more

Grid Metals Expands Leadership Team With Appointment of Chief Development Officer

Nickel, Manitoba, Grid Metals, GRDM.V

Grid Metals Corp. (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) is pleased to announce the appointment of Brandon Smith, CFA, MFE as Chief Development Officer effective immediately. Brandon Smith is a seasoned capital markets professional with over a decade of experience, and most recently, he was the lead equity research analyst covering battery metals developers for one of Canada’s leading independent investment banks. read more

Grid Metals Corp. Completes Resource Drilling at Donner Lake Lithium Property

Nickel, Manitoba, Grid Metals, GRDM.V
Grid Metals Corp., Wednesday, April 5, 2023, Press release picture

 Grid Metals Corp (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) is pleased to announce drill results from the completion of the resource drill program at the Donner Lake Lithium Property located in southeast Manitoba which totalled 17,643 metres. The pending resource calculation for Donner Lake will include results from both the Main Dyke and Northwest Dyke. The current program of resource drilling started in October 2022. read more

Grid Metals Announces Near Surface High-Grade Lithium, Cesium and Tantalum Drill Core Assays at Falcon West

Nickel, Manitoba, Grid Metals, GRDM.V
Grid Metals Corp., Tuesday, March 28, 2023, Press release picture

Grid Metals Corp (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) today announced assay results for drill core samples obtained from a 2012 exploration program on the Lucy claim, part of the Company’s 100% owned Falcon West Lithium Property (the “Property”). The Property is located approximately 120 km east of Winnipeg, Manitoba, and 110 km south of the Company’s Donner Lake Lithium property. The 2012 drill core had not been previously assayed, and the new samples were obtained by Grid staff from Mr. William C. Hood, P. Geo., who was the vendor of the property. The new assays outline an outcropping and relatively flat-lying, highly fractionated spodumene-bearing pegmatite system featuring high grade lithium, cesium, and tantalum values. The area is only a few hundred metres from the Trans-Canada Highway. read more

Grid Metals Corp Announces Strong Second Wave of Results From the Main Dyke Lithium Drilling

Nickel, Manitoba, Grid Metals, GRDM.V
Grid Metals Corp., Wednesday, February 1, 2023, Press release picture

Grid Metals Corp (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) today reported results from an additional five (5) holes at its Donner Lake Lithium Property (the “Property”), located in the Bird River Greenstone Belt of southeastern Manitoba. The holes are part of an ongoing resource delineation drilling program at the Main Dyke. All delineation holes from the current campaign have intercepted significant, high grade lithium values in the Main Dyke and, locally, in at least three proximal sub-parallel dykes that were not previously known. Donner Lake is currently a 75% / 25% joint venture with Lithium Royalty Corp. Grid has an MOU in place with Tantalum Mining Corporation of Canada Limited focused on creating a toll milling operation to process spodumene-bearing pegmatites from Grid’s Donner Lake Property. read more

Grid Metals Corp Announces Initial Drill Results at Donner Lake Lithium Property, Se Manitoba

Nickel, Manitoba, Grid Metals, GRDM.V
Drill HoleUTM EUTM NZone IntervalAssays
AzimuthDipFrom (m)To (m)Li2O %Interval (m)
GDL22-19147°-45317627561028645.246.11.70.8
160.4163.81.73.4
GDL22-20147°-70317627561028681.482.81.71.4
224.2227.01.52.8
GDL22-21147°-453175565610213116.3120.71.64.4
GDL22-22147°-703175565610213164.2169.81.05.6
GDL22-23147°-45317464561009775.277.71.52.5
GDL22-24147°-703146475610097108.0117.51.49.5
145.0147.81.52.7

Grid Metals Corp (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) is pleased to announce the results for the initial six holes of an ongoing exploration and resource delineation drilling program at its Donner Lake Lithium Property (the “Property”), located in the Bird River Greenstone Belt of southeastern Manitoba, 150 kilometers from Winnipeg. The holes targeted the Main Dyke pegmatite and included intersections of 9.5 metres of 1.4% Li2O, 4.3 metres of 1.6% Li2O and 3.4 metres of 1.7% Li2O. Drilling has now covered a strike length exceeding 800 metres and to a vertical depth of up to 250 metres. Donner Lake is a 75% / 25% joint venture with Lithium Royalty Corp. read more

Grid Metals Corp Acquires Falcon West Lithium Project in Southeastern Manitoba

Project area includes high grade lithium values in historical drilling results
Nickel, Manitoba, Grid Metals, GRDM.V
Grid Metals Corp., Thursday, January 12, 2023, Press release picture

Grid Metals Corp (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) today announced the acquisition of mineral rights comprising the Falcon West Lithium Property (the “Property”) which is located approximately 110 km east of Winnipeg, Manitoba and 100 km south of the Company’s Donner Lake lithium property. The property covers 61,268 hectares and ~70 km of strike length of a highly prospective geological contact zone that features several drill intersected spodumene-rich pegmatites featuring highly anomalous lithium grades. The initial focus of exploration will be the “ADL” ( the ArtDon and Lucy pegmatites) TargetArea, which comprises an ~1.25 km trend of outcropping lithium bearing pegmatites. The Company believes the Falcon West acquisition is highly complementary to the Companys’ Donner Lake Lithium project as both are located in an infrastructure-rich exploration jurisdiction in proximity to Canada’s only current spodumene mining operation (the Tanco Mine). read more

Grid Metals Board of Directors Appointment

Nickel, Manitoba, Grid Metals, GRDM.V

Grid Metals Corp (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) announced that Patrick Murphy, a resident of Sydney Australia, has been appointed to the board of directors of Grid Metals by the vote of shareholders. Mr. Murphy is a Managing Director at the specialist natural resources group AMCI. AMCI is a highly successful fully integrated global private natural resources business with exploration, development, production, processing, logistics and marketing expertise, inclusive of substantial bulk materials and battery minerals investments. read more

Grid Metals Corp Completes 15 Drill Holes at Donner Lake Lithium Project; Drilling Ongoing

Nickel, Manitoba, Grid Metals, GRDM.V
Grid Metals Corp., Tuesday, November 29, 2022, Press release picture

Grid Metals Corp (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) today provided a progress update on its drill program at its Donner Lake Lithium Property (the “Property”), located in the Bird River Greenstone Belt of southeastern Manitoba. The program will include resource delineation drilling at the Main and Northwest dykes and a series of exploration holes targeting untested spodumene bearing pegmatites. The Company maintains the near-term goal of establishing a maiden resource from the Main and Northwest dykes via the current drilling program. The property is a 75%/25% joint venture between Grid Metals Corp. and Lithium Royalty Corp. read more

Grid Metals Corp Commences Drilling at Donner Lake Lithium Property

Nickel, Manitoba, Grid Metals, GRDM.V
Grid Metals Corp., Tuesday, November 8, 2022, Press release picture

Grid Metals Corp (TSXV:GRDM)(OTCQB:MSMGF) (the “Company”) today provided an overview of its drilling plans for its Donner Lake Lithium Property (the “Property”), located in the in the Bird River Greenstone Belt of southeastern Manitoba. The first of two rigs to be utilized during the program has commenced drilling at the Property. The drill program will focus on resource delineation on two spodumene-bearing pegmatite dykes (Main and Northwest dykes) and initial exploration of several additional pegmatite targets. The property is a 75%/25% joint venture between Grid Metals Corp. and Lithium Royalty Corp. read more