NexGen Energy Ltd. (TSX: NXE) (NYSE: NXE) (ASX: NXG) (“NexGen” or the “Company”) is pleased to announce continued exciting results from the summer drill program at the rapidly advancing PCE. Step-out holes RK-25-254 and RK-25-256 intersected 2.0 m and 2.1 m of cumulative >61,000 counts per second (cps), respectively, located 51 m up-dip and 119 m down-dip of PCE’s best hole to date, RK-25-232 (Figures 1 and 2). These represent the best holes from the summer program to date and validate the growth in high-grade continuity. Overall, an upgraded high-grade shoot plunges a minimum 200 m from RK-25-254 to RK-24-222 as part of an emerging interpreted pattern of high-grade shoots spaced 70 m apart (Figures 2 and 3). read more