Grid Metals Intersects 13.75 metres of 1.53% Li2O and 8.0 metres of 1.47% in First Two Holes at the Donner Lake Lithium Property Manitoba Canada
Grid Metals Corp. (the “Company“) (TSXV:GRDM)(OTCQB:MSMGF) is pleased to report initial results from its 2022 lithium exploration program at its Donner Lake lithium property in southeastern Manitoba. The Company completed 11 drill holes targeting the Northwest Dyke – one of several known lithium-cesium-tantalum (LCT) -type pegmatite dykes on the property. All holes at the Northwest Dyke intersected spodumene-bearing pegmatites over a strike length of 600m. Two drill holes were completed on the West Dykes and numerous smaller pegmatites were intercepted. The new drilling at the Northwest Dyke was the first since 1955. The company is awaiting results on the other holes. The project is located in southeastern Manitoba in the Winnipeg River pegmatite field, which hosts the world-class Tanco Pegmatite.