NexGen Commences Expanded 43,000 Meter Drill Program at Patterson Corridor East

Figure 1: PCE area with drilling to date and relative location to Arrow. The primary target area (shown in green) outlines where testing for high-grade expansion and footprint extents will focus. (CNW Group/NexGen Energy Ltd.)

NexGen Energy Ltd. (“NexGen” or the “Company”) (TSX: NXE) (NYSE: NXE) (ASX: NXG) is excited to announce the commencement of a 43,000 meter (m) exploration drill program to continue to test the extents and growth of mineralization discovered in early 2024 at Patterson Corridor East (PCE) located 3.5 km east of the world-class Arrow Deposit. This systematic program represents an increase of 9,000 m from the 2024 program and is expected to be one of the largest drill programs in the Athabasca Basin, Saskatchewan in 2025. The initial results at PCE revealed vein-type uranium mineralization intersected within the competent basement rock, highly analogous to Arrow. Since discovery, the mineralized footprint at PCE has rapidly grown to 600 m along strike and 600 m of vertical extent (see November 12, 2024 news release). read more