Millennial Reports Positive Pumping Test Results from Third Production Scale Well at Pastos Grandes Project, Argentina; Investor Relations and Communications / Branding Agreements

V.ML, Millenial Lithium, lithium, Argentina

Millennial Lithium Corp. (TSXV: ML) (“Millennial” or the “Company”) is pleased to report encouraging results from a short-term pumping test of a third production-scale well at its Pastos Grandes Project in Salta, Argentina. Pumping well PGPW18-17 was installed as a future production well, and meanwhile to undertake short-term pumping of lithium brine to determine aquifer parameters and chemical variation during a 72-hour period in March, 2019. At a pumping rate of 19.4 litres/second (L/s), the drawdown was approximately 30 metres (m), with rapid water level recovery. Estimated transmissivity was calculated from the water level recovery data to be about 100 square metres per day (m2/day). The pumping test was completed under the direction and supervision of Montgomery & Associates. read more

Skyharbour Partner Company Azincourt Energy Commences Drilling at East Preston Project in Saskatchewan

V.SYH, Skyharbour, Uranium,

Skyharbour Resources Ltd. SYH)”>(TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce that its partner company Azincourt Energy Corp. (“Azincourt”) has commenced phase one of its diamond drilling at the East Preston Uranium Project, in the western Athabasca Basin, northern Saskatchewan. read more