Gran Colombia Announces Results From the 2021 Drill Program at Its Toroparu Project in Guyana; Confirms 4-Km Strike Length of Structurally Controlled High-Grade Gold Mineralized Structures

Figure 5

Gran Colombia Gold Corp. (TSX: GCM, OTCQX: TPRFF) (“Gran Colombia” or the “Company”) is pleased to announce results from the recently completed Phase 2 diamond drill program at its 100%-owned Toroparu Project in Western Guyana. The 10,494 meters Phase 2 program was designed to confirm the continuity of both the northwest oriented high-grade gold structures and the cross cutting east-west high-grade structures that create a repeatable pattern of intersecting zones amenable to underground mining methods over the 4 kilometer strike length of the Toroparu Project1. read more