GR Silver Mining Reports High-Grade and Wide Silver Mineralization From Drilling in the San Juan Area

Figure 1: San Juan Area: Multiple Veins in a Large Epithermal System (Drone image) (CNW Group/GR Silver Mining Ltd.)
  • 2.0 m @ 954 g/t Ag, 1.3 g/t Au, 1.2 % Pb and 1.6 % Zn (1,177g/t AgEq1)
    including 1.0 m @ 1,184 g/t Ag, 2.3 g/t Au, 1.3 % Pb and 0.9 % Zn (1,486 g/t AgEq)
  • 1.1 m @ 781 g/t Ag, 0.2 g/t Au, 1.5 % Pb and 0.3 % Zn (863 g/t AgEq)
  • 22.3 m @ 62 g/t Ag, 0.3 g/t Au, 0.6 % Pb and 0.4 % Zn (126 g/t AgEq)

GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to report drill results that extend the high-grade silver mineralization 100 m to the north along strike in the San Juan Vein. Additionally, a wide, up to 65 m continuous silver mineralized zone, is delineated on the footwall of the Yecora Vein, defining shallow wide mineralized zones to be included in the upcoming maiden resource estimate at San Juan. Both veins are part of the vein system of the San Juan Area of the Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico. read more

GR Silver Mining Reports High-grade Underground Sampling Results at Plomosas, Including Assays up to 6,128 gpt Ag over 0.2 meters.

V.GRSL, GR Silver Mining, silver, gold, Mexico
Figure 1- Location – Underground Workings – Channel Sampling San Juan Vein (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (TSXV: GRSLFRANKFURT: GPE, OTCQB: GLYXF) (“GR Silver” or the “Company”) – is pleased to announce assay results for initial underground channel sampling from the San Juan underground workings at the recently acquired Plomosas Silver Project (“Plomosas”), in Sinaloa, MexicoSan Juan is one of six priority areas with underground development not yet exploited by previous owners (view photo here). The underground workings at San Juan have recently been rehabilitated by GR Silver to allow for this initial sampling program. The company is currently validating all recent and historical information, including the review of over 500 drill holes in the six priority areas and sampling mineralized zones, aiming to complete multiple resource estimations in 2020. read more