Eloro Resources Announces Upsized Bought Deal Financing To C$8.5

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (the “Company” or “Eloro“) (TSXV: ELO) (OTCQX: ELRRF) (FSE: P2QM) is pleased to announce that in connection with its previously announced bought deal financing, the Company and Cormark Securities Inc., (the “Underwriter“) have agreed to increase the size of the previously announced financing. The Underwriter has agreed to purchase, on a bought deal basis, 2,615,400 units of the Company (the “Units“) at a price of C$3.25 per Unit for gross proceeds to the Company of approximately C$8.5 million (the “Offering“). Each Unit will consist of one common share in the capital of the Company (each a “Common Share“) and one-half of one common share purchase warrant (each whole warrant, a “Warrant“) of the Company. Each Warrant shall entitle the holder to acquire an additional Common Share at a price of C$4.75 for a period of 24 months following the closing of the Offering. read more

Eloro Resources Intersects 169.11 g Ag eq/t (64.30 g Ag/t, 0.96% Zn, 0.37% Pb and 0.07% Sn) over 235.55m to further Expand Higher Grade area to the North in the Eastern Part of the Santa Barbara Target at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes a higher-grade section in this underground hole DSBU-06 (Azimuth 00 and dip -650) of 314.52 g Ag eq/t (192.18g Ag/t, 0.22 g Au/t, 0.07% Zn, 0.41% Pb, and 0.11% Sn) over 50.68m and an additional intersection of 110.57 g Ag eq/t (17.38 g Ag/t, 0.09 g Au/t, 0.30% Zn, 0.21% Pb and 0.11%Sn) over 128.44m further down the hole. Overall, for DSBU-06, 86% of this 599.8m long hole had reportable intersections, which collectively average 129.70 g Ag eq/t. Underground hole DSBU-05 on the same due north section as DSBU-06, but shallower at -400, intersected 141.05 g Ag eq/t (22.99g Ag/t, 0.07g Au/t, 0.18% Zn, 0.16% Pb, 0.21% Cu and 0.12% Sn) over 153.25m. Hole DSBU-05 has a second major intersection lower in the hole from 348.08m to 526.17m of 92.47 g Ag eq/t (23.86g Ag/t, 0.96% Zn, 0.21% Pb) over 178.09m. Overall, 65% of this 641.9m long hole had reportable intersections which collectively average 107.73 g Ag eq/t.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Figure 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from an additional six (6) diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Holes DSBU-05 and DSBU-06 are underground holes drilled from the Santa Barbara adit to test the northern extension of the higher-grade mineralized zone. Hole DSBS-01 was collared in the southern part of the Santa Barbara target zone and drilled at an azimuth of 300 and dip of -300 to test the same target. Holes DSB-24, DSB-14 and DSB-22 were drilled at azimuths of 2250 to test the northwest extension of the Santa Barbara mineralized zone approximately 100m, 200m, and 1,000m, respectively, northwest of the Santa Barbara adit underground drill bay. Drilling is continuing in the Porco area to test for a potential Sn porphyry as suggested by the 3D inverse magnetic model (see Eloro press release March 1, 2022). Thus far, 4,870 m in five (5) holes have been completed in the Porco target area with assays pending. read more

Eloro Resources Intersects 172.43 g Ag eq/t (40.16 g Ag/t, 0.51% Zn, 0.41% Pb and 0.13% Sn) over 303.05m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes higher-grade sections of 507.64 g Ag eq/t (119.36 g Ag/t, 0.14 g Au/t, 0.57 %Pb and 0.52 %Sn) over 49.55m from 0.0 to 49.55m and 196.67 g Ag eq/t (66.93 g Ag/t, 1.03% Zn, 0.67% Pb and 0.08% Sn) over 77.77m in underground drill hole METSBUG-02. Hole DSB-20, which is in approximately the centre of the NW Extension target area, intersected 22 reportable intersections with a best result of 129.42 g Ag eq/t (21.79 g Ag/t, 0.27% Zn, 0.36% Pb and 0.12% Sn) over 73.65m including a higher-grade section of 204.03 g Ag eq/t (27.54 g Ag/t, 0.40% Zn, 0.55% Pb and 0.21% Sn) over 28.57m.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce assay results from six (6) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Hole METSBUG-02 is an underground hole drilled northeast from the Santa Barbara adit for metallurgical purposes and to complete fill-in drilling. The remaining five (5) holes tested the NW extension in the Santa Barbara Mineral Resource Target Area (DSB-12, -13, -15, -20 and -21) on a series of NE-SW sections as shown in Figure 1. read more

GR Silver Mining Defines New High-Grade Gold Zones Parallel to the Plomosas Vein System, Including 0.4 m at 9.7 g/t Au and 2.0 m at 4.45 g/t Au

Figure 1: Geological Map of the Trampolín and Corta Pico Vein Systems (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – is pleased to report first exploration results for the Trampolín and Corta Pico vein systems, representing a set of N-S and NE-SW trending veins, located between the Plomosas and Loma Dorada vein systems. The Trampolín vein system can be considered the NE extension of the San Juan vein system, expanding the footprint of Au mineralization over 1,300 m to the NE (Figure 1). The results from Trampolín and Corta Pico confirm the presence of two Au-rich epithermal vein systems with the potential for higher-grade Au and Ag mineralization at depth. Mineralization at Trampolín and Corta Pico remains open along strike and down dip for future drilling. read more

Eloro Resources Intersects 239.72 g Ag eq/t (39.58 g Ag/t, 1.04% Pb, 0.26% Cu and 0.20% Sn) over 82.74m in Southern Part of Santa Barbara Target at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Includes a higher-grade section of 318.15 g Ag eq/t (53.58 g Ag/t, 1.43 % Pb, 0.32 %Cu and 0.27 %Sn) over 51.09m in underground drill hole DSBU-01. 134.47 g Ag eq/t (10.79 g Ag/t, and 0.15 %Sn) over 115.44m including a higher-grade section of 160.87 g Ag eq/t (9.65 g Ag/t, 0.21% Cu, and 0.17 %Sn) over 37.55m in underground hole DSBU-02. Promising results from these holes across a well mineralized width of 200+m opens significant possibilities in the southern extension of the Santa Barbara target area where additional drilling is now planned.
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to announce further assay results from seven (7) additional diamond drill holes from its on-going drilling program at the Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. Two (2) of these holes (DSBU-01 and DSBU-02) are underground holes drilled from the Santa Barbara adit. Three (3) of the holes tested the Central Breccia Pipe (“CBP”) target (DCN-06 and DCN-07 from the Central North radial drilling platform and DCS-04 from the south platform). The final two (2) holes reported in this release tested the Porco Breccia Pipe (“PBP”) target. read more

Eloro Intersects 100 Ag eq/t (including 38.71 g Ag/t, 0.88%Zn and 0.51%Pb) over 188.5 m in the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Section includes a higher-grade zone of 154 g Ag eq/t (including 75.51 g Ag/t, 0.96% Zn, 0.65% Pb and 0.16% Cu) over 65.8m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 34,409 metres (m) in 64 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from one (1) additional hole which tested the Santa Barbara Breccia Pipe (“SBBP”) (Hole DHK-23) and two holes (DCN-05 and DCS-03) which tested the Central Breccia Pipe target (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are continuing to drill at SBBP to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights are as follows: read more

Eloro Intersects 160.22g Ag eq/t (36.53 g Ag/t, 1.63%Zn, 1.20%Pb and 0.10%Sn) over 194.14 m in the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Section includes 350.91 g Ag eq/t (112.57 g Ag/t, 1.41% Zn, 3.08% Pb and 0.33% Sn) over 30.06m
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF; FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 30,014 metres (m) in 57 drill holes including three (3) in progress to test major target areas at Iska Iska. This press release reports drilling results from two (2) additional holes which tested the Santa Barbara Breccia Pipe (“SBBP”) (Holes DHK-21 and DHK-22). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are completing drilling at SBBP in order to outline an initial National Instrument 43-101 (“NI 43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of the SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. This map depicts the recently identified robust magnetic anomaly to the northwest of the SBBP where drilling is in progress (see press release June 7, 2021, for an overview of the magnetic results). Figure 2 is a north-south section showing the major potential extension of the SBBP mineralized system. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending, as well as holes in progress in the three major target areas. Highlights are as follows: read more

GR Silver Mining Announces High-Grade Au-Ag Discovery at the GAP Area

V.GRSL, GR Silver Mining, silver, gold, Mexico
Figure 1 – Geologic Map of the GAP Area with sample locations and highlights of high-grade Au-Ag results (CNW Group/GR Silver Mining Ltd.)

GR Silver Mining Ltd. (“GR Silver Mining” or the “Company”) (TSXV: GRSL) (OTCQB: GRSLF) (FRANKFURT: GPE) – announces that it has received high-grade results from the exploration sampling program of newly discovered Au-Ag rich epithermal veins in the GAP Area, located between the San Juan and San Marcial Areas in Sinaloa, Mexico. read more

Eloro Intersects 234.19g Ag eq/t over 53.20m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

Step out drilling northwest of Santa Barbara Breccia Pipe demonstrates room for expansion of the mineralized strike length of the breccia pipe and its surrounding mineralized envelope to over 1.2km Definition drilling in progress to define a maiden NI 43-101 compliant mineral resource within a target block measuring 1,200m along strike, 500m wide and extending to a depth of up to 600m in Santa Barbara Breccia Pipe and its surrounding mineralized envelope
ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in the Potosi Department, southern Bolivia. To date, the Company has completed 58 diamond drill holes totalling 26,982 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) (Holes DDHK-19 and DHK-20) and the central-southern part of the Central Breccia Pipe (“CBP”) (Holes DCN-04 and DCS-02). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. Two surface drill rigs are completing drilling at SBBP in order to outline an initial National Instrument 43-101 (“NI-43-101”) compliant resource. A third drill, an underground rig, situated in the west end of the Santa Barbara Adit, is testing the eastern part of SBBP and its mineralized envelope. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. This map depicts a recently identified robust magnetic anomaly to the northwest of the SBBP where drilling is in progress (see press release June 7, 2021, for an overview of the magnetic results). Figure 2 is a north-south section showing the major potential extension of the SBBP mineralized system. Table 1 provides significant drilling results with definitions of chemical symbols and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more

Eloro Intersects 129.65 g Ag eq/t over 300.75m in the Mineralized Envelope of the Santa Barbara Breccia Pipe at the Iska Iska Silver-Tin Polymetallic Project, Potosi Department, Bolivia

ELO.V, Eloro, 321gold.com, Bob Moriarty, Bolivia, Iska Iska property,
Table 1

Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) (“Eloro”, or the “Company”) is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia. To date, the Company has completed 46 diamond drill holes totalling 22,398.9 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe (“SBBP”) and the central-southern part of the Central Breccia Pipe (“CBP”). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the major Porco (South) Target. The second surface drill is currently cleaning out drill holes on the SBBP radial platform for the planned downhole induced polarization/resistivity (IP/RES) survey then will be moved to test the gap area between the Central and Porco Breccia Pipes. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. This drill will shortly be moved to a new drill bay recently completed on the west end of the Santa Barbara adit. Figure 1 is a geological plan map showing locations of drill holes and an updated geological interpretation. Figure 2 is a more detailed geological plan map of the SBBP and northern CBP areas showing the magnetic low target to the northwest of the SBBP where drilling is planned (see press release June 7, 2021 for an overview of the magnetic results). Table 1 provides significant drilling results and Table 2 lists holes completed with assays pending as well as holes in progress in the three major target areas. Highlights are as follows: read more